Gravel Driveway Planner

Enter the size of your driveway to get tons of stone for each layer, the fabric, dig depth, crown and soil to haul away — priced and in the order you’ll build it.

Your project

One car: 10–12 ft. Two cars side by side: 20–24 ft.

Crusher run packs into a hard surface; #57 drains well but stays loose.

Usually 2–3 in.

Usually 3–4 in. Enter 0 to leave it out.

4–6 in; 8 in on clay or soft ground. Enter 0 to leave it out on firm, well-drained soil.

Your local prices (optional)
$

Delivered prices commonly run $30–65 per ton; ask your quarry.

$
$
$
$
Project sheet · Gravel Drivewaydiycalcs.org
Plan view (to scale) Crown 50' 12'Crusher run 3 in#57 stone 4 in#3 stone 4 inFabricCrown 3 inDig 11 in12'Cross-sectionSection: vertical scale exaggerated
Shopping list
BoughtItemBuyCost
Bottom layer: #3 stone (1–2½ in)8.52 cu yd for 4 in compacted11.93 tons$536.67
Middle layer: #57 stone (¾ in, clean)8.52 cu yd for 4 in compacted11.93 tons$536.67
Top layer: crusher run / #4116.39 cu yd for 3 in compacted9.58 tons$431.25
Geotextile driveway fabric86 sq yd, incl. 1 ft up each side and 10% for overlaps770 sq ft$192.50
Estimated materials total$1,697.08
Stone is ordered 15% heavy for compaction. Excludes delivery fees, tax and equipment rental; quarries often have a minimum load.
Total stone to order33.44 US tons30.33 metric tonnes
Dig depth for a surface level with the ground11 in27.94 cmDig 1–2 in less if you want the drive to sit slightly higher and shed water.
Crown (center above the edges)3 in7.62 cm½ in per foot from each edge (about 4%).
Soil to dig out and haul away25.46 cu yd19.47 m³20.37 cu yd in the ground grows about 25% once dug.
Driveway area600 sq ft55.74 m²
Materials cost per sq ft$2.83

Order of work

  1. Call 811 (in the US) a few days before digging so buried utilities are marked. Ask your town or county whether a new driveway or a connection to the road needs a permit — many require one, and some require a culvert where the drive crosses a roadside ditch.
  2. Stake out the driveway and set string lines at the finished height, sloping the drive so water runs away from the house and garage.
  3. Strip the grass and topsoil and dig to the depth shown above. Remove soft spots and roots; save good topsoil for the shoulders and lawn repairs.
  4. Shape and compact the ground with the same crown as the finished surface — about ½ in per foot from each edge up to the centerline — then compact it until it’s firm.
  5. Roll out the fabric if you’re using it, overlapping seams 12–18 in and running it up the sides of the excavation.
  6. Spread and compact the #3 stone, then the #57 stone, no more than about 4 in at a time, keeping the crown as you go.
  7. Spread the top layer, dampen crusher run lightly and compact it so the stone dust binds. Check the crown with a string line and level.
  8. Finish the edges: install edging if you chose it, then backfill and seed the shoulders so they sit just below the gravel and let water drain off.

Tools you’ll need

  • Plate compactor for paths and small drives; a walk-behind or ride-on vibratory roller for long driveways (both are rental items)
  • Skid steer or compact tractor with a box blade for digging and spreading, or shovels and a wheelbarrow for a short drive
  • Landscape rake (wide aluminum) and a steel rake
  • Stakes, mason’s line, line level and a 4 ft level to set the slope and crown
  • Tape measure and marking paint
  • Utility knife for fabric, and gloves, safety glasses and hearing protection

Tips before you buy

  • Have each layer dumped where it will be spread, and ask whether the driver can spread it from the tailgate as the truck moves — many quarries offer this, and it saves hours of raking.
  • Don’t use pea gravel or river rock on a driveway: round stones roll under tires instead of locking together.
  • Drainage matters more than depth. A crowned surface and shoulders that sit lower than the gravel keep water from softening the base.
  • Keep a few tons of the top stone on hand for the first year; low spots and ruts are easy to fill while the drive settles.
  • On soft or very wet ground, or for heavy trucks, ask a local contractor or your county engineer about a thicker base.